Transformer on-site maintenance

  • Wash the transformer and the cell washer.
  • Blown and sucked from the elements measuring cells and power. Wash doors and cell caps.
  • Correction oil leaks.
  • Changing the gasket.
  • Changing insulators and ironworks of low and high voltage.
  • Reviewing and changing elements of measurement and control of power transformers.
  • Electrical tests.
  • Sucked and blown with nitrogen to dry transformers.

Autopista Norte Paraje el Noral
1 km after of Copacabana

Telephone +57(4) - 444 0430
Fax +57(4) - 274 1414

email: rymel@rymel.com.co
Copacabana - Antioquia - Colombia

Rymel - Copyight © All rights reserved